The entry into force of the Code on Territorial Planning, Urbanism and Construction (“CATUC”), enacted by Law No. 169/2026, changes the legal framework applicable to construction works carried out without a building permit or in breach of an existing permit.
The new legislation introduces both a dedicated regularisation procedure and a limited period during which regularisation may be sought for categories of construction that do not qualify for the permanent regime.
The regularisation permit offers an opportunity to regularise certain unauthorised constructions, subject to compliance with the applicable legal requirements, the relevant statutory deadline and significant associated costs.
1. The Regularisation Permit under CATUC
Article 301 of CATUC expressly regulates regularisation permits for construction works carried out without a building permit or in breach of an existing permit.
The new framework distinguishes between two regimes for obtaining a regularisation permit:
- Permanent regime – limited to the categories listed in Article 301(2) of CATUC: single-family dwellings with a ground-floor or ground-floor-plus-one-storey configuration and a total gross floor area of no more than 150 sqm, which are not listed historical monuments and are located outside the protection zones of historical monuments or protected built-up areas; ancillary buildings serving residential properties, household outbuildings or buildings serving agricultural holdings, with a total gross floor area of no more than 150 sqm; and works enclosing balconies without extending onto public land. For these categories, a regularisation permit may be obtained at any time; and
- Temporary regime – applicable to all other categories of construction not listed in Article 301(2). For these categories, a regularisation permit may be applied for within one year of CATUC entering into force, i.e. by 25 August 2027, subject to the statutory requirements.
The following analysis focuses on the procedure and implications of regularising construction falling within the temporary regime.
2. Requirements for Obtaining a Regularisation Permit under the Temporary Regime
Pursuant to Article 301(7) of CATUC, to obtain a regularisation permit, the construction works must comply with the urban planning regulations approved as at the date the regularisation permit is issued and satisfy the fundamental requirements applicable to construction quality. Any applicable tax obligations and measures imposed for contraventions must also have been fulfilled.
Compliance with urban planning regulations is verified by the specialist department of the relevant local public authority or, where qualified personnel are unavailable, by urban planning specialists with the requisite signing rights engaged by the applicant.
Compliance with the fundamental construction quality requirements is assessed on the basis of technical expert reports prepared by certified experts for each relevant field and speciality. These requirements cover mechanical resistance and stability, fire safety, hygiene, health and environmental protection, safety and accessibility in use, protection against noise and energy efficiency, and thermal insulation.
Furthermore, Article 301(10) of CATUC allows the local authority to require works to be carried out to bring the construction into compliance with urban planning regulations and/or the technical requirements governing construction quality.
3. Costs and Financial Implications of Regularisation
The temporary regime entails increased costs.
Under Article 301(8) of CATUC, the contributions payable for state control in the fields of territorial planning, urbanism and construction, as well as the fees for the urban planning certificate and the building permit, are set at ten times the amounts ordinarily applicable.
These amounts are in addition to the costs of technical expert reports, specialist documentation and any works required to bring the construction into compliance.
Article 301(11) of CATUC also provides for a 100% increase in the building tax applicable to construction carried out without a building permit or in breach of an existing permit. The increase applies from the date on which the competent local authority identifies the unauthorised construction until regularisation or, as applicable, demolition. The law expressly provides that payment of the tax does not regularise the construction for the purposes of the obligations imposed by urban planning and construction quality legislation, nor does it preclude the application of sanctions for breaches of construction regulations.
In addition, pursuant to Article 357(1) of CATUC, carrying out construction works without a building permit or in breach of an existing permit constitutes an administrative offence, unless the circumstances are such that the conduct qualifies as a criminal offence under criminal law. The offence is punishable by a fine ranging from RON 50,000 to RON 1,000,000, depending on the seriousness of the infringement and its impact on neighbouring properties.
4. Consequences of Missing the One-Year Deadline
Articles 301(12)-(15) of CATUC regulate the measures applicable after the expiry of the temporary period where a regularisation permit has not been obtained.
In the circumstances provided for by law, local public authorities may proceed with the demolition of unauthorised works and recover the associated costs, or they are required to apply to the competent court for an order requiring the demolition of construction that has not been regularised.
Under Article 301(13) of CATUC, the mayor, acting on behalf of the relevant administrative-territorial unit, must file the court application within 30 days of the expiry of the period provided for in Article 301(7), i.e. by reference to the deadline of 25 August 2027. The application is based on an official inspection report drawn up by the relevant department of the local authority or by the State Inspectorate for Construction (ISC).
The court may order the total or partial demolition of the construction or, as appropriate, measures to restore the previous state of affairs.
Under Article 301(15) of CATUC, a demolition judgment constitutes an enforceable title and is immediately communicated to the enforcement authorities of the local public administration, which will proceed with the demolition at the offender’s expense under a simplified procedure.
5. Conclusions
CATUC introduces a time-limited opportunity to regularise construction carried out without a building permit or in breach of an existing permit by obtaining a regularisation permit within one year of the law entering into force. However, this opportunity entails significant costs, arising both from increased fees and taxes and from the need to prepare the required technical documentation and expert reports.
As verification of the fundamental construction quality requirements involves expert reports covering all relevant fields and specialities, the time required to engage specialists, carry out assessments and prepare the necessary documentation should be factored in from the outset.
The one-year deadline therefore calls for a proactive approach and an early assessment of the situation, allowing sufficient time to prepare and submit the application within the statutory period.